Expand navigation
LIVE
WORK
PLAY
NYHETER
DESTINASJON
SERVICES
KONTAKT OSS
MEGLEROMRÃ…DE
DK
ENG
ES
FI
FR
NL
SE
LIVE
WORK
PLAY
NYHETER
DESTINASJON
SERVICES
KONTAKT OSS
MEGLEROMRÃ…DE
DK
ENG
ES
FI
FR
NL
SE
#HW217PROGRESS
Phase I
Phase II
Phase III
Phase IV
Phase V
Phase VI
Phase VII
Phase VIII
Phase IX
VILLAS
Phase XI
Phase XIV
Urbanisation
2021 10 Flowers blooming and gardens turning greener in Phase I
2021 10 The gardens in Phase I have grown immensely in just one year
2021 10 Phase I one year later
2020 12 A perspective of Phase I
2020 12 View of Blocks 11 and 12 from the Herb Garden
2020 12 The lower car park in Phase I and the back of Block 11
2020 12 Phase I upper pool in front of Blocks 3 to 6
2020 12 Phase I amphitheatre
2020 12 Blocks 11 and 12 in Phase I
2020 12 Phase I upper pool in front of Blocks 3 and 4
2020 12 Phase I upper pool
2020 12 Phase I steps between blocks 4 and 5
2002 12 Phase I upper pool with views to the Mediterranean Sea
2020 12 The lower pool in front of Blocks 9 and 10
2020 12 The lower car park in front of Phase I Blocks 11 and 12
2020 12 Perspective view of Phase I
2020 12 The walking trail opposite Blocks 7 to 11 in Phase I is ready for use
2020 12 Blocks 3 - 6 in Phase I ready for handover
2020 11 The Phase I top pool in front of Blocks 3 to 6 is ready
2020 11 Aerial view of Phase I shows the completed top car park
2020 10 Benches to enjoy the aromatic garden are installed
2020 10 The top car park by Blocks 5 and 6 being dressed with trees
2020 09 Upper parking reaching final stages in Phase I
2020 08 Phase I aerial view
2020 08 Blocks 9 to 12 and lower pool in Phase I
2020 08 Blocks 1 to 10 in Phase I
2020 08 The top car park in Phase I is well advanced
2020 08 Signage at the lower pool toilet facilities in Phase I
2020 08 The directional signs with their original rusted finish now installed
2020 08 Block 10 entrance ready to welcome its owners
2020 08 The first block to get its identifying number
2020 07 The final touches in Phase I car park
2020 07 The new street number marks the entrance to Phase I
2020 07 The aromatic garden is getting greener
2020 07 Blocks 5 and 6 getting their coat of paint
2020 06 Progress at the top pool in Phase I
2020 05 The garden villas in block 11 now have lawns
2020 05 Block 5 is transformed as it is painted white
2020 05 Adding the stone cladding to the entrance
2020 05 Arches added to the pergola in the aromatic garden
2020 05 Another level of exterior walls on block 6
2020 05 The painters move onto block 5
2020 04 The entrance to the garage in block 1 is ready
2020 04 Green areas at blocks 9 and 10
2020 04 Work in the lower pool surrounding area
2020 04 Palm trees by the lower outdoor car park
2020 04 Green areas outside block 1
2020 04 Work on fencing the path by the infinity pool
2020 04 The path looking over the amphitheatre is fenced
2020 04 Terraces and pergolas in blocks 5 and 6
2020 04 The exteriors of blocks 3 and 4 are almost ready
2020 04 Going over the final details on block 9
2020 04 Pergola in the aromatic garden taking shape
2020 04 Giant Ficus and palm trees behind blocks 10 and 11
2020 04 Blocks 3 - 6 advancing in Phase I
2020 03 Phase I top parking area taking shape
2020 03 - First lawns in Phase I Garden Villas and communal areas
2020 02 - The paths are ready in the Phase I aromatic garden
2020 02 - The landscaping team have been hard at work in Phase I
2020 02 - The first Garden Villas in Phase I to get their lawns
2020 02 - Phase I communal areas getting greener
2020 02 - Paths are created in the aromatic garden in Phase I
2020 02 - Newly planted cypresses frame the aromatic garden
2020 02 - An aerial view of Phase I from the southwest
2020 02 - An aerial view of Phase I and communal areas progress
2020 01 - The foundations for the aromatic garden in Phase I are being laid
2020 01 - Phase I outdoor car park ready
2020 01 - Phase I main entrance gate reaches the final stages
2020 01 - Phase I amphitheatre with newly planted cork oak trees
2020 01 - Blocks 7 - 11 in Phase I overlooking the future green belt
2020 01 - Block 4 in Phase I gets another coat of paint
2019 12 - The aromatic garden in Phase I takes shape
2019 12 - Phase I parking and communal areas progressing
2019 11 - The beautiful meandering path of Phase I
2019 11 - Planting the first trees in Phase I
2019 11 - Phase I exterior parking coming along nicely
2019 11 - Phase I communal areas begin to take shape
2019 11 - Curves are the common theme in Phase I
2019 11 - Communal areas in Phase I taking shape
2019 10 - The lower pool in Phase I takes shape
2019 10 - The gabion walls go up in Phase I
2019 10 - Kitchens being installed in Phase I, Block 12
2019 10 - Beautiful Phase I curves, courtesy of construction company Jarquil
2019 09 - The shape of pools to come in Phase I
2019 09 - Phase I steel grilles are installed
2019 09 - Phase I features advancing with grilles added to block 12
2019 08 Phases I, II and III construction overview
2019 08 Phase I windows in Blocks 9 and 10 next
2019 08 Floors are laid on the terraces in Phase I, blocks 11 and 12
2019 08 - Birds eye view of construction progress in Phases I, II and III
2019 07 Progress shot of Phases I and II
2019 07 Phase I blocks 7 - 12 in progress
2019 07 - The first Sky Villa pools (an optional extra) being built in Phase I
2019 07 - Phase I aerial view
2019 06 - We have started to install the windows in Phase I
2019 06 - Progress is happening in Phase I
2019 06 - Jarquil construction company making Phase I a reality
2019 06 - Construction progress in Phases I and II with a Mediterranean backdrop
2019 06 - An aerial view of Phases I, III, IV and V
2019 05 - The terraces in blocks 7 - 12 in Phase I
2019 05 - Showing off the curves in Phase I
2019 05 - Progress shot of all 12 blocks in Phase I
2019 05 - Phase I is coming together with lots of activity on each block
2019 05 - Evaluating progress in the first phases
2019 05 - Birds eye view of Phases I-V
2019 05 - Aerial view of construction progress in Phase I
2019 01 - The walls in block 11 and 12 in Phase I are rising
2019 01 - Phase I continues to take shape
2018 12 - The structure of block 11 and 12
2018 12 - Progress shot of blocks 1, 2, 10, 11 and 12 in Phase I
2018 12 - Progress in block 3 and 4 in Phase I
2018 12 - Beautiful evening skies over HW217 with spectacular views of Africa
2018 11 - The first blocks in Phase I are rising
2018 11 - Phase I is taking shape
2018 11 - Blocks 1 and 2 are taking shape
2018 11 - Aerial view of the first phases
2018 11 - Aerial view of Phase I
2018 10 - The structure of blocks 7 to 12 are going up
2018 10 - The Middle floor apartments in blocks 1 and 2 are starting to take shape
2018 10 - Structure going up in Phase I
2018 10 - Looking at the progress on our first phases
2018 10 - Jarquil Construcción is working hard to make Phase I a reality
2018 09 - More exterior walls going up in Phase I
2018 09 - First basements going in
2018 09 - Exterior walls going up in Phase I
2018 09 - 3 crane towers now working hard on Phase I
2018 08 - Phase I birdeye view excavation
2018 08 - Phase I basements being excavated
2018 08 - Laying in foundations for the walls in Phase I
2018 07 - Phase I in the process of being cleared
2022 05 The street number by the lower entrance to Phase II
2022 01 Benches installed in front of Blocks 13 to 16 in Phase II
2022 01 Stone benches and Corten steel signage installed in Phase II
2022 01 Mailboxes by the Phase II main entrance
2021 10 Palm trees growing in the grass by Block 16
2021 10 Palm trees growing behind Blocks 17 and 18 in Phase II
2021 10 Grass growing around the lower pool in Phase II
2021 09 Grass planted and ready to grow behind Block 16
2021 09 9 palm trees standing 3.5 metres tall around the upper pool in Phase II
2021 09 Grass planted in front of Blocks 13 to 16 in Phase II
2021 08 The Phase II upper pool is ready to be filled with water
2021 08 Mailboxes installed by the lower access to Phase II
2021 08 Mailboxes installed by the main entrance in Phase II
2021 08 The security hut by the main entrance in Phase II
2021 07 Blocks 27 and 28 in Phase II
2021 07 Blocks 23 and 24 in Phase II
2021 07 Blocks 19 and 20 in Phase II
2021 05 The Phase II main entrance with the security hut taking shape
2021 05 Phase II upper pool behind Blocks 17 to 20
2021 05 The foundations for the upper pool in Phase II are in
2021 05 The upper pool in Phase II advances
2021 05 Laying the pavements around the urbanisation in Phase II
2021 05 Urbanisation works advance
2021 05 Pladur in the ceiling of a terrace in Phase II
2021 05 Phase II architectural features
2021 05 The lower pool in Phase II is taking shape
2021 05 Progress in Blocks 23 and 24 in Phase II
2021 05 The back of Blocks 23 and 24 in Phase II
2021 05 The pavement takes shape behind Blocks 21 and 22
2021 05 Blocks 21 and 22 advancing in Phase II
2021 05 Block 17 in Phase II advances
2021 05 Progress on Block 13 in Phase II
2021 05 Progress on terraces in Blocks 13 and 14 in Phase II
2021 05 Phase II progress on Blocks 13 to 16
2021 04 A perspective of the gabion walls in the urbanisation in Phase II
2021 04 Building the gabion walls in Phase II
2021 04 Painting the terrace ceilings in Block 27
2021 04 Painting the ceilings of the terraces in Block 25 Phase II
2021 04 Work in progress on Blocks 21 and 22
2021 04 Making the final touches to the exterior walls of Block 19
2021 04 A perspective view of Blocks 21 and 22 in Phase II
2021 04 The upper pool in front of Blocks 19 and 20 advances
2021 04 The brick wall around the Phase II upper pool gains height
2021 04 Blocks 15 and 16 in Phase II advancing
2021 03 Rendering the exterior of Block 24 in Phase II
2021 03 Blocks 23 and 24 ready for the stairwell grills to be installed
2021 03 Work in progress in Blocks 21 to 24
2021 03 The stairwell grills are installed in Block 21 Phase II
2021 03 Blocks 19 and 20 in Phase II
2021 03 Work on terraces at the back of Blocks 19 and 20
2021 03 Work advances on Blocks 17 and 18 in Phase II
2021 03 Progress on the Sky Villa in Block 16
2021 03 Dividing walls go up between Garden Villas in Blocks 15 and 16
2021 03 Exterior walls of Block 13 in Phase II
2021 03 Block 13 in Phase II
2021 03 Progress in Blocks 13 to 20 in Phase II
2021 03 Stairwell grills have been installed in Blocks 13 and 14
2021 03 Installing the terrace doors in Blocks 13 and 14 Phase II
2021 03 Installing the stairwell grills in Phase II Blocks 13 and 14
2021 02 Rendering the exterior of Block 28 in Phase II
2021 02 Tiles being laid on the terraces of Block 26
2021 02 Blocks 19 and 20 ready for the last windows to be installed
2021 02 Work advances in Blocks 17 and 18 in Phase II
2021 02 Windows now installed in Blocks 17 and 18 in Phase II
2021 02 Phase II progress in Blocks 17 - 20
2021 02 The structure for the stairwell grills is ready in Block 15
2021 02 Rendering the exterior walls of Block 13 in Phase II
2021 02 Phase II progress in Blocks 13 - 16
2021 01 Tiling the Sky Villa terrace in Block 28 Phase II
2021 01 Progress in Blocks 27 and 28 Phase II
2021 01 Progress in Block 25 Phase II
2021 01 Exterior walls of Blocks 23 and 24 rendering nearly complete
2021 01 Rendering the facades of Blocks 23 and 24 nearly complete
2021 01 Progress in Phase II Block 22
2021 01 Progress in Phase II Block 20
2021 01 Preparing to close the side terraces in Phase II Block 19
2021 01 Rendering the facade of Block 19 in Phase II nears completion
2021 01 Installation of terrace windows advances in Blocks 19 and 20
2021 01 Installing terrace doors at Sky Villa level in Blocks 17 and 18
2021 01 Working on the stairwells in Block 15 Phase II
2021 01 A closer look at progress in Blocks 15 and 16
2021 01 Progress in Phase II Blocks 15 and 16
2021 01 Tiling the Sky Villa terraces in Block 13 Phase II
2021 01 Blocks 13 and 14 exteriors complete as last windows are installed
2020 12 Terrace windows installation ongoing in Blocks 27 and 28
2020 12 Installation of suspended ceilings advances in Block 27
2020 12 Terrace doors being installed in Block 26 Phase II
2020 12 Stage one of internal partitions complete in Block 25
2020 12 Stage one of internal partitions complete in Blocks 21 and 22
2020 12 The final stages of rendering Block 17 Phase II
2020 12 Working on the stairwells in Block 15 Phase II
2020 12 A perspective view of Blocks 17-28 in Phase II
2020 11 Progress on Blocks 13 and 14 Phase II
2020 11 Rendering of Blocks 27 and 28 in Phase II almost complete
2020 11 Progress in Phase II Blocks 25 and 26
2020 11 Blocks 23 and 24 in Phase II turn white as rendering advances
2020 11 A close up of facade rendering in Phase II Block 21
2020 11 Facade rendering advances in Phase II Blocks 19 and 20
2020 11 Aerial view of Blocks 19 to 26 in Phase II
2020 11 The facades of Blocks 17 and 18 in Phase II are rendered
2020 11 Perspective view of blocks 16 to 28 in Phase II
2020 11 The sliding doors are installed in Blocks 15 and 16 in Phase II
2020 10 The electrical installation in a Phase II apartment
2020 10 Phase II floor tiles are fitted
2020 10 The glass goes in on Phase II terraces
2020 10 Glass balustrades are installed on the terraces in Phase II
2020 10 Blocks 27 and 28 exterior walls are rendered
2020 10 The facades of Blocks 25 and 26 are rendered
2020 10 Blocks 15 and 16 turn white as exterior walls are rendered
2020 10 Windows and terrace frames are installed in Blocks 13 and 14
2020 09 Blocks 19 to 28 have their rooftops rendered
2020 09 Phase II main entrance is being built by Blocks 13 to 18
2020 08 Rendering nearly completed on blocks 13 and 14
2020 08 Block 28 will turn white as exterior rendering begins
2020 08 Rendering has started in blocks 25 and 26
2020 08 The impressive gabion wall by block 28 marks the perimeter of Phase II
2020 08 Tidying up the window edges as Blocks 13 and 14 are rendered
2020 07 Block 13 exterior walls are rendered
2020 07 Rendering of block 13 exterior walls
2020 07 The gabion walls in Phase II taking shape
2020 07 Bricklayers at work in blocks 25 and 26
2020 07 The exterior walls are up in blocks 23 and 24
2020 07 Work inside block 22
2020 07 Progress in blocks 15 and 16
2020 07 Work in progress blocks 13 and 14
2020 06 Building of exterior walls in blocks 23 and 24 begins
2020 06 Work has started inside block 22
2020 06 Exterior walls are up in blocks 21 and 22
2020 06 Rooftop works in blocks 13 and 14
2020 05 Showing off terraces and pergolas in blocks 13 - 16
2020 05 Dividing walls in blocks 25 and 26
2020 05 Progress in blocks 23 and 24
2020 05 Exterior walls progress at the back of blocks 21 and 22
2020 05 Progress in blocks 21 and 22
2020 05 Building of exterior walls begins in blocks 19 and 20
2020 05 Preparations in block 17 for bricklaying to begin
2020 05 The exterior walls are up in blocks 15 and 16
2020 04 Phase II construction progress
2020 04 The structure in block 24 ready for the bricklayers
2020 04 The staircases in blocks 13 and 14 work get their roofs
2020 04 Bricklaying near the top of block 27
2020 04 Symmetrical stairwell structures in Phase II blocks 13 and 14
2020 04 Phase II work in progress blocks 13 and 14
2020 04 Exterior walls going up in Phase II blocks 15 and 16
2020 03 Phase II construction progress
2020 03 - Sky Villa in block 13 Phase II takes shape
2020 03 - Phase II structure going up
2020 03 - Phase II structure going up in block 16
2020 03 - Creating an elevator shaft in Phase II
2020 03 - Bricklaying in Phase II blocks 15 and 16
2019 11 - Structure in place and exterior walls being built in Phase II
2019 11 - Phase II exterior walls being built
2019 11 - Building the exterior walls in Blocks 13-16
2019 10 - Phases II and III at sunrise
2019 10 - Exterior walls going up in Phase II, Blocks 26 and 27
2019 10 - Exterior wall bricklaying in Phase II, Block 13
2019 10 - Cement being poured in Phase II, Block 18
2019 09 - The structure is ready in Phase II, blocks 13 and 14
2019 09 - Phase II Blocks 21-28 construction progress
2019 08 Phases I, II and III construction overview
2019 08 Blocks 17 - 20 basement roofs and 1st floor roofs in blocks 25 - 28
2019 08 - Phase II on the rise, the Sky Villa level coming next
2019 08 - Phase II blocks 13 - 16 ready for the Sky Villa level
2019 08 - Birds eye view of construction progress in Phases I, II and III
2019 07 Progress shot of Phases I and II
2019 07 Blocks in Phase II at various stages of construction
2019 07 - Progress shot of blocks 18-28 in Phase II
2019 07 - Pillars in the basement of block 24 Phase II go up
2019 07 - Phase II installing 2nd floor roofs
2019 07 - Garden Villa levels are surfacing in Phase II
2019 07 - Floors being laid in Phase II
2019 07 - Blocks 19 and 20 Phase II basements happening
2019 07 - Blocks 13 - 16 in Phase II on the rise
2019 07 - Block 28 in Phase II
2019 07 - 1st floor level reached in Phase II blocks 13 - 16
2019 06 - The structures for blocks 13 and 14 are going up
2019 06 - Finishing up the basement walls in Phase II
2019 06 - Construction progress in Phases I and II with a Mediterranean backdrop
2019 06 - Basement walls finalised in Phase II
2019 06 - A birds eye view of progress in Phase II
2019 06 - 4 crane towers working hard on Phase II
2019 05 - The structure is going up in Phase II
2019 05 - Laying the foundations for the walls in Phase II
2019 05 - Foundations progress in blocks 17 - 24 in Phase II
2019 05 - Exterior walls going up in Phase II
2019 05 - Excavation of basements blocks 21 - 26 in Phase II .jpeg
2019 05 - Evaluating progress in the first phases
2019 05 - Birds eye view of Phases I-V
2018 12 - Beautiful evening skies over HW217 with spectacular views of Africa
2018 11 - Excavation of the basements in Phase II
2018 11 - Aerial view of the first phases
2018 10 - Looking at the progress on our first phases
2018 10 - Leveling the earth on phase II
2021 09 The upper childrens pool in Phase III
2021 09 The grass is growing around the upper pool in Phase III
2021 09 The upper pool in Phase III
2021 09 Phase III is getting greener by the day
2021 09 Garage pillars painted in true HW217 style in Phase III
2021 09 The home sweet home has been added just below Block 44
2021 08 The Corten steel signage for blocks in Phase III
2021 08 Corten steel signage in Phase III showing the way
2021 08 Phase III mailboxes in true HW217 style
2021 08 Trees and plants growing in Phase III
2021 05 The street number marking Phase III is up
2021 05 The grass around the lower pool is growing
2021 05 The grass turns greener in Phase III
2021 05 Grass is planted around the lower pool in Phase III
2021 05 Phase III shower screens ready to go in
2021 05 Phase III gets greener around Blocks 42 and 43
2021 05 Block 41 in Phase III
2021 05 Phase III garage
2021 05 The back of Block 39 in Phase III
2021 05 Terrace details in Phase III
2021 05 The urbanisation around Blocks 35 and 36 turning green
2021 05 Phase III Garden Villas
2021 05 Plants are growing in front of Block 35 in Phase III
2021 05 Blocks 29 and 30 in Phase III
2021 04 Mailboxes installed by the main entrance in Phase III
2021 04 The Phase III security hut and mailbox area take shape
2021 04 Preparing to plant the hedge around the lower pool in Phase III
2021 04 The lower pool in Phase III
2021 04 Working on the car park below Blocks 37 and 38
2021 04 A perspective of Block 42 in Phase III
2021 04 The elevator by Block 41 has been installed
2021 04 Block 41 in Phase III
2021 04 Block 41 in Phase III reaching for the skies
2021 04 Final touches to the exterior of Block 39 in Phase III
2021 04 Working on the interiors in Block 37
2021 04 Blocks 35 and 36 in Phase III
2021 04 Views of Blocks 35 and 36 from the lower pool in Phase III
2021 04 Ready to plant the hedge around the pool in front of Blocks 35-38
2021 04 Blocks 33 and 34 in Phase III
2021 04 Blocks 31 and 32 in Phase III
2021 04 Blocks 31 and 32 ready for the kitchens to be installed
2021 04 Preparing to install the kitchens in Blocks 29-32 Phase III
2021 03 Installing the pedestrian entrance gate by Block 42
2021 03 Work around the urbanisation in Phase III
2021 03 Block 43 in Phase III
2021 03 Finishing touches to the exterior in Block 42
2021 03 Blocks 39 and 40 in Phase III
2021 03 The upper pool in Phase III
2021 03 Paved area ready behind Blocks 35 and 36 in Phase III
2021 03 Progress on Blocks 37 and 38 in Phase III
2021 03 Blocks 35 and 36 in Phase III
2021 03 Blocks 33 and 34 in Phase III
2021 The lower pool by Blocks 31 and 32 in Phase III
2021 03 Finishing touches on the exterior rendering of Block 29
2021 03 The back of Blocks 29 and 30 in Phase III
2021 02 7 Washingtonia palms planted around the upper pool
2021 02 The paved area by the upper pool in Phase III
2021 02 Showers being installed around the lower pool in Phase III
2021 02 Terrace doors now installed in Block 43 in Phase III
2021 02 Terrace doors installed in Block 42 Phase III
2021 02 Installing the terrace doors in Block 41 Phase III
2021 02 Progress on Block 39 in Phase III
2021 02 Progress on Blocks 37 and 38 in Phase III
2021 02 Final touches on the exterior walls of Blocks 35 and 36 in Phase III
2021 02 Progress on Blocks 35 - 28 in Phase III
2021 02 Blocks 33 and 34 in Phase III
2021 02 Blocks 31 and 32 in Phase III
2021 02 Blocks 29 and 30 in Phase III
2021 02 Phase III paving stones being laid alongside Blocks 29 and 30
2021 01 Another crane tower being taken down in Phase III
2021 01 Work on installing the sliding doors in Block 43 Phase III
2021 01 Final touches to the rendering at Sky Villa level in Block 40
2021 01 Rendering of Blocks 39 and 40 in Phase III almost complete
2021 01 Preparing to install the last glass balustrades in Block 38
2021 01 A lot of activity in Blocks 35 and 36 in Phase III
2021 01 Installing the grills on the stairwells in Blocks 33 and 34
2021 01 Installation of the grills on the stairwells in Phase III advances
2021 01 Progress in Block 31 Phase III
2021 01 Final touches to the rendering of the Phase III upper pool walls
2021 01 Work on one of the access points between Phase III and the green belt
2021 01 Community fencing going up around Phase III
2020 12 Preparing to render a Garden Villa wall in Phase III
2020 12 Work commences on rendering the upper pool walls in Phase III
2020 12 A Garden Villa pool in progress in Phase III
2020 12 Installing the grills on the stairwell of Block 37 Phase III
2020 12 Tiling the stairwell of Block 42
2020 12 Glass balustrades now installed on the terraces of Blocks 33 and 34
2020 12 Phase III lower pool walls are rendered
2020 12 A view from above of Phase III pools construction progress
2020 12 A perspective view of Phase III
2020 11 Cementing the walls of the upper pool now complete
2020 11 The view through the sliding doors in Phase III
2020 11 Block 42 in Phase III is ready for its sliding doors to be installed
2020 11 The sliding doors are installed in Phase III Block 41
2020 11 Facade rendering progress in blocks 39 and 40 Phase III
2020 11 Final touches to the rendering of Blocks 37 and 38 Phase III
2020 11 Rendering of facades complete in Phase III Blocks 35 and 36
2020 11 Glass balustrades are installed in Phase III Blocks 33 and 34
2020 11 Rendering of Blocks 29 and 30 in Phase III almost complete
2020 11 An aerial view showing construction progress in Phase III
2020 10 Getting ready to cement the shape of the lower pool in Phase III
2020 10 Preparations for the wardrobes to be fitted in Phase III
2020 10 Floor to ceiling sliding doors installed in Phase III
2020 10 Sanitary fittings to be installed in this Phase III Sky Villa
2020 10 Glass balustrades installed on the terraces in Phase III
2020 10 The walls of the lower pool in Phase III are built
2020 10 Progress on the upper pool in Phase III
2020 10 Glass balustrades now installed in Blocks 33 and 34
2020 10 The facades are being rendered in Block 41
2020 10 Block 42 facade is rendered with glass terrace doors ready to go in
2020 10 Block 43 facade is rendered
2020 10 Sliding doors are installed on the terraces of Blocks 37 and 38
2020 10 Sliding terrace doors are installed in Blocks 35 and 36
2020 10 Blocks 31 and 32 are rendered as terrace doors are installed
2020 09 Walls built around the pools and rendering of block exteriors progresses
2020 08 The curved exterior walls have been built around the lower pool
2020 08 Completing rendering in Blocks 37 and 38 as terrace glass is installed
2020 08 Glass is installed on the terraces in blocks 35 and 36
2020 08 Rendering of block 41 exterior advances
2020 08 Rendering progress in block 42
2020 08 Installing glass on the terraces in blocks 37 and 38
2020 08 Blocks 39 and 40 turning white as rendering begins
2020 08 Work in progress as the glass is installed on block 38 terraces
2020 08 The wall is built along the edge of the top pool
2020 08 Glass is installed on the terraces of blocks 35 and 36
2020 08 Foundations laid in the top pool in Phase III
2020 07 The top pool is progressing in Phase III
2020 07 The stairwell at the back of block 41 takes shape
2020 07 Exterior painting nearing completion in block 41
2020 07 Painting blocks 37 and 38 in parallel
2020 07 Painting from the top down in blocks 31 and 32
2020 06 Phase III lower pool foundations are laid
2020 06 Exterior walls are now up in block 43
2020 06 Painting in progress on blocks 37 and 38
2020 06 Blocks 35 and 36 exterior progress
2020 06 Painting progress in blocks 31 and 32
2020 05 Construction progresses in blocks 39 and 40
2020 05 Building the gabion walls around the top pool
2020 05 Painting almost complete on blocks 35 and 36
2020 05 Bricklaying at Sky Villa level on block 40
2020 04 Phase III construction progress
2020 04 Terrace ceilings painted in blocks 36 and 35
2020 04 Excavation works on the lower pool in Phase III
2020 04 Blocks 35 - 38 in progress
2020 04 Phase III top pool taking shape in front of block 41
2020 04 The exterior walls at the back of block 38
2020 04 Working up through the levels in block 40
2020 04 Painting progresses in block 35
2020 04 Terrace walls going up next here in Phase III
2020 04 Painters at work Phase III block 38
2020 04 Curved terraces materialise in Phase III block 31
2020 04 Blocks 34 and 39 in Phase III showing off their curves and pergolas
2020 03 The Phase III pergolas take shape
2020 03 - Gabion walls of Phase III Garden Villas from above
2020 03 - Exterior walls going up in Phase III, blocks 33 and 34
2020 03 - Exterior walls going up in Phase III blocks 42 and 43
2020 02 - The structure rises in Phase III, blocks 29 and 30
2020 02 - The structure in Phase III nears completion
2020 02 - The exterior walls go up in Phase III blocks 31 and 32
2020 02 - Phase III structure completed
2020 02 - Phase III blocks 39 and 40 structure complete
2019 12 - The basement structure in Phase III is almost complete
2019 11 - Topographers ensuring heights are according to plan in Phase III
2019 11 - The roof goes on the Garden Villa in block 43 Phase III
2019 11 - The blocks are on the rise in Phase III
2019 11 - Phase III Sky Villa floors go down in blocks 35 - 38
2019 11 - Floors at various levels in Phase III
2019 11 - Cement is poured into the pillars of blocks 31 and 32 in Phase III
2019 11 - Basement walls going up in Phase III blocks 29 and 30
2019 10 - The basement pillars go up in Phase III, Blocks 41-43
2019 10 - Phases II and III at sunrise
2019 10 - Phase III foundations going in and neighbouring 1st floor roof
2019 10 - Phase III basements progress .jpeg
2019 10 - Foundations being laid in Phase III
2019 10 - Floors taking shape in Phase III
2019 10 - 5 Cranes hard at work in Phase III
2019 09 - Phase III foundations ready for cement to be poured in
2019 09 - First basement wall going up in Phase III
2019 09 - Basement floors laid in Phase III, blocks 41-43
2019 09 - Basement floor laid in Phase III, blocks 35 and 36
2019 08 The foundations are in for Phase III blocks 35 and 36
2019 08 Phases I, II and III construction overview
2019 08 - Birds eye view of construction progress in Phases I, II and III
2019 07 Basements taking shape in Phase III
2019 07 - The outline of the first blocks in Phase III
2019 07 - Excavation of basements in Phase III
2019 06 - An aerial view of Phases I, III, IV and V
2019 05 - Levelling off the land in Phase III
2019 05 - Evaluating progress in the first phases
2019 05 - Birds eye view of Phases I-V
2019 05 - Aerial view of the earth movements on Phase III in preparation for construction
2018 12 - Beautiful sunset over the Mediterranean Sea from Phase III
2022 01 More directional signs installed
2022 01 Directional signs with their original rusted finish now installed
2022 01 Climbing rosemary and feather grass planted in Phase IV
2021 12 Four stone benches form a circle by the upper pool
2021 12 The backs of Blocks 44 to 46 in Phase IV
2021 12 Blocks 44 to 46 in Phase IV
2021 11 Plants are already growing in Phase IV
2021 11 The Corten steel signage on Phase IV blocks
2021 11 Phase IV mailboxes are ready
2021 11 The street number in front of Phase IV is up
2021 10 An aerial view of Phase IV
2021 10 Palm trees growing by the lower pool in Phase IV
2021 10 Palm trees planted around the lower pool in Phase IV
2021 10 Phase IV numbers painted in the garage below Blocks 44 to 46
2021 10 The top entrance to Phase IV is ready for the mailboxes to be installed
2021 10 The upper pool in Phase IV
2021 10 Palm trees planted around the upper pool in Phase IV
2021 10 A Sky Villa in Phase IV with beautiful views to the Mediterranean
2021 10 Blocks 44 to 46 in Phase IV
2021 10 Block 44 in Phase IV
2021 09 The upper pool in Phase IV
2021 09 Progress on the lower pool in Phase IV
2021 09 34 Melia Azedarach trees planted in Phase IV
2021 09 Block 51 in Phase IV
2021 09 Phase IV trees planted behind Blocks 49 and 50
2021 09 The back of Blocks 47 and 48 in Phase IV
2021 09 Blocks 47 to 50 in Phase IV
2021 09 The garage entrance just below block 44
2021 09 Blocks 44 to 46 in Phase IV
2021 08 Progress on the paved area in Phase IV
2021 08 Phase IV upper pool in progress
2021 08 Phase IV lower pool in progress
2021 08 The stairs in Phase IV are ready for rendering
2021 08 The Phase IV garage pillars have been painted in true HW217 style
2021 08 Block 51 in Phase IV
2021 08 Block 50 in Phase IV
2021 08 The back of Blocks 49 and 50 in Phase IV
2021 08 8 trees planted at the back of Blocks 49 and 50
2021 08 The front of Blocks 49 and 50 in Phase IV
2021 08 The stairwell grills on Block 48 are finished
2021 08 Work on the gabion wall surrounding Block 47
2021 08 Progress on Block 47 in Phase IV
2021 08 Progress on the paved area behind Block 46 in Phase IV
2021 08 Phase IV installations happening in Block 44
2021 08 Blocks 44 to 46 in Phase IV
2021 07 Tiling the upper pool in Phase IV
2021 07 Block 51 in Phase IV
2021 07 Progress in Phase IV Block 51
2021 07 A perspective of Blocks 49 and 50 in Phase IV
2021 07 Painters at work in Blocks 47 and 48
2021 07 Progress on Block 47 in Phase IV
2021 07 Terrace doors being installed in Blocks 47 and 48 Phase IV
2021 07 Windows and terrace doors being installed in Blocks 47-50
2021 07 Cleaning in progress at Sky Villa level in Block 46
2021 07 Glass balustrades being installed in Phase IV Block 44
2021 07 Progress in Phase IV Blocks 44 - 46
2021 07 Phase IV lower pool foundations are in
2021 05 Phase IV progress on Block 51
2021 05 Works on flooring in Block 49 in Phase IV
2021 05 Painting Blocks 49 and 50 in Phase IV
2021 05 Creating the gabion walls in Phase IV
2021 05 Working on the terraces in Block 47
2021 05 The gabion walls marking the Garden Villas in Blocks 47 to 50
2021 05 Progress on the terrace flooring in Phase IV
2021 05 Installing the stairwell grill at the back of Block 44
2021 05 Blocks 44 and 46 together with the lower pool in Phase IV
2021 05 Phase IV progress in Blocks 44 and 45
2021 04 Air conditioning units being installed on the roof of Block 51
2021 04 Working on the lower pool in Phase IV
2021 03 Progress on Block 51 in Phase IV
2021 03 Progress on Block 46 in Phase IV
2021 03 Phase IV progress on Block 44
2021 03 The pool by Blocks 47-49 taking shape
2021 03 Progress in Block 51 Phase IV
2021 03 Windows being installed in Blocks 49 and 50
2021 03 Final stages of rendering exteriors in Blocks 47 and 48
2021 03 Progress at Sky Villa level in Block 46
2021 03 Windows being installed in Phase IV
2021 03 Phase IV progress in Block 44
2021 02 The pool by Blocks 47-49 takes shape as the walls are built
2021 02 Terrace doors being installed in Block 51
2021 02 Tiling the terrace in a Garden Villa in Block 51
2021 02 Outlining the wall of a Garden Villa in Block 50
2021 02 Windows being installed in Blocks 49 and 50
2021 02 Blocks 49 and 50 now white after rendering the exterior walls
2021 02 Rendering the exteriors at Sky Villa level in Block 47
2021 02 Rendering exterior walls in Blocks 47 and 48
2021 02 Terrace doors ready to be installed in Block 46
2021 02 Rendering the exterior walls of Block 45 in Phase IV
2021 02 Progress in Block 44 Phase IV
2021 02 Preparing for the windows to be installed in Blocks 44 - 46
2021 01 Another view of the pool wall being built in Phase IV
2021 01 The pool wall being built up in front of Block 44
2021 01 Building the pool in front of Blocks 47 to 49
2021 01 Rendering the exterior walls of Block 51 in Phase IV
2021 01 Building the separating walls in Phase IV Block 49
2021 01 Rendering of Blocks 47 and 48 in Phase IV is underway
2021 01 Rendering exteriors of Blocks 45 and 46 in Phase IV
2021 01 Progress on rendering the facade of Block 44 Phase IV
2020 12 Rendering almost complete in this aerial view of Phase IV
2020 12 Waterproofing the terraces of Blocks 49 and 50 is complete
2020 12 Perspective view of facades rendering in Phase IV
2020 11 Rendering of Block 51 in Phase IV is well advanced
2020 11 Phase IV Blocks 47 and 48 facades ready to be rendered
2020 11 Exterior brickwork almost complete in Block 44 Phase IV
2020 11 Perspective view of Phase IV
2020 11 The exterior walls are rendered in Phase IV Block 46
2020 10 Block 51 turns white as exterior walls are rendered
2020 10 Bricklaying exterior walls in Blocks 47 and 48
2020 10 The exterior walls are complete in Block 44
2020 09 Phase IV aerial view
2020 08 Now building the exterior walls in blocks 45 and 46
2020 08 Exterior and dividing walls go up in block 44
2020 08 Exterior walls almost completed in blocks 49 to 51
2020 08 Bricklaying well advanced as the exterior walls in blocks 47 to 50 go up
2020 07 The terraces are built in block 51
2020 07 Blocks 47 and 48 structures completed
2020 07 The completed structure for blocks 44 to 46
2020 06 The structure rises in blocks 49 and 50
2020 06 Structure rising in block 44
2020 05 More levels added to blocks 49 and 50
2020 05 The structure rising in blocks 44 and 45
2020 05 Phase IV structure rising
2020 05 A topographer on block 51 checks heights are as planned
2020 05 Work in progress on 1st floor of block 50
2020 05 The structure is rising in blocks 49 and 50
2020 05 Men at work on the basement roof in block 48
2020 05 Preparation for the basement exterior walls in block 47
2020 05 The beginnings of the structure in block 44
2020 04 Phase IV construction progress
2020 04 Early stages of the Garden Villa in block 50
2020 04 Creating the structure for block 50
2020 04 Block 51 gains height
2020 04 Shaping the exterior wall of the basement in block 46
2020 04 More activity on the basement roof in block 50
2020 04 The structure goes up another level in block 51, Phase IV
2020 04 Phase IV block 49 exterior basement wall being built
2020 04 It's all happening on the basement roof in block 50
2020 04 Basement exterior walls and pillars in block 49
2020 04 The structure goes up in block 45, Phase IV
2020 03 The Phase IV structure rises
2020 03 - The structure in Phase IV starts to go up
2020 03 - Preparing for Phase IV foundations to be laid
2020 03 - Phase IV foundations being laid
2020 03 - Phase IV foundations are laid and structures go up
2020 03 - Excavation finished in Phase IV
2020 02 - Phase IV excavation completed and ready for foundations to go in
2020 02 - Foundations being laid in Phase IV
2019 11 - Excavation of the first blocks in Phase IV
2019 06 - An aerial view of Phases I, III, IV and V
2019 05 - Levelling off the land in Phase IV
2019 05 - Birds eye view of Phases I-V
2022 05 The grass and trees growing in Phase V
2022 05 A total of 9.525 flowers and trees planted in Phase V
2022 05 The back of Blocks 56 to 59 in Phase V
2022 01 The final touches to the Phase V car park
2022 01 Looking up at the stairwell grills and Phase V block signage
2022 01 Plants growing in the individual Phase V gardens
2022 01 Planting in the individual Phase V gardens
2021 12 Mailboxes installed by the entrance to Phase V
2021 12 The Phase V entrance now with gates installed
2021 12 4 Washintonia palm trees planted around the pool in Phase V
2021 12 Block 59 overlooks the palm trees around the Phase V pool
2021 12 Block 58 in Phase V
2021 12 Blocks 56 and 57 overlooking the pool in Phase V
2021 11 Juniper trees being planted below the pool in Phase V
2021 11 Planting jupiter trees in Phase V
2021 11 Laying decorative white stones in Phase V
2021 11 The fence around Phase V is being installed
2021 11 Final touches to the Phase V pool
2021 11 The spot for the Phase V mailboxes is ready
2021 11 The entrance to Phase V takes shape
2021 11 The back of Blocks 56 and 57
2021 11 Blocks 54 to 57 in Phase V
2021 10 A perspective of Phase V entrance
2021 10 A perspective of Phase V progress
2021 10 Phase V aerial view
2021 10 A perspective of Phase V
2021 10 Mosaic tiles being laid in the pool in Phase V
2021 10 The Phase V garage below Blocks 56 to 59
2021 10 Block 59 in Phase V
2021 10 Block 58 ready for the garden fence
2021 10 Blocks 52 and 53 in Phase V
2021 09 The upper pool walls are ready to be rendered in Phase V
2021 09 894 kilos of stone make up the gabion walls in Phase V
2021 09 The paved areas take shape as cobblestones are laid
2021 09 Building the Phase V entrance
2021 09 Installing glass balustrades in Block 57 Phase V
2021 09 Glass balustrades being installed in Block 56 Phase V
2021 09 Phase V exterior rendering in progress by Blocks 56 and 57
2021 09 Progress on Blocks 56 to 58 in Phase V
2021 09 Progress on Blocks 54 and 55 in Phase V
2021 09 The shell of a Garden Villa pool in Phase V takes shape
2021 09 Lighting installed on the terraces in Block 53 Phase V
2021 08 Installing the last glass balustrades on the terraces of Blocks 52 and 5
2021 08 Facade rendering almost complete in Blocks 54 and 55
2021 08 Glass balustrades being installed in Block 55 Phase V
2021 08 Rendering the facade reaches final stages in Blocks 56 and 57
2021 08 The Phase V entrance is starting to take shape
2021 08 Working on the waterproofing of Block 56 in Phase V
2021 08 Installing the glass balustrades on terraces in Block 58
2021 08 Fencing going up around the Garden Villas in Blocks 58 and 59
2021 08 Working at Sky Villa level in Phase V
2021 08 Working around the pool in Phase V
2021 08 More work in progress around the pool in Phase V
2021 07 Rendering the exterior of Blocks 56 and 57
2021 07 Painters working at Sky Villa level in Block 59
2021 07 Progress in Block 59 Phase V
2021 07 Finishing touches to the stairwell grills in Block 58
2021 07 Progress in Block 58 in Phase V
2021 07 A perspective of Blocks 56 and 57 in Phase V
2021 07 Blocks 56 and 57 advancing in Phase V
2021 07 Glass balustrades being installed in Blocks 54 and 55
2021 07 A perspective of Blocks 54 and 55 through the Green Belt
2021 07 The Phase V pool and Blocks 52 to 57
2021 07 Progress on Blocks 52 and 53 in Phase V
2021 05 Preparations for the pool walls in Phase V
2021 05 The last section of Pladur waiting to be rendered in Block 59
2021 05 Progress on Blocks 58 and 59 in Phase V
2021 05 A lot of activity in Blocks 56 and 57 in Phase V
2021 05 Blocks 56 and 57 in Phase V advancing
2021 05 Block 55 in Phase V advancing